|
|
|
|
Rules, regulations, instructions and manuals
|
|
Rules, regulations, instructions, manuals and records used by employees for discharging their functions
|
| |
|
For rules, regulations and instructions, the Signal Directorate Manual shall be followed.? In addition to Signal Directorate Manual, there are some other documents e.g. work instructions and guidelines, which shall be followed by the employees in specific areas for discharging their functions.? These are :
|
| |
|
S. No.
|
Documents Name
|
Description / Title
|
|
1.
|
SI-WI-7.1-1
|
Work instructions for issue of drawing nos., Specification nos., design documents etc.
|
|
2.
|
SI-WI-7.1-2
|
Work Instructions for type test of samples in Signal Lab.
|
|
3.
|
SI-WI-7.1-3
|
Work Instructions for Vendor Development.
|
|
4.
|
SI-WI-7.6-1
|
Work instructions for control and calibration of measuring and testing equipments/instruments.
|
|
5.
|
SI-G-7.1-1
|
Guidelines for inspection of material
|
|
6.
|
SI-G-7.1-2
|
Procedure for Type testing of Relays
|
|
7.
|
SI-G-7.1-3
|
Procedure for Type testing of Various Signalling cables.
|
|
8.
|
SI-G-7.1-4
|
Procedure for Type testing of Power supply equipment
|
|
9.
|
SI-G-7.1-5
|
Procedure for Environmental testing
|
|
10.
|
SI-G-7.6-1
|
Identification scheme of testing and measuring equipments/instruments.
|
|
11.
|
SI-G-4.2.3-1
|
Guidelines for numbering of formats in Signal Directorate.
|
|
| |
|
Some quality plans for calibration of various measuring instruments have also been prepared which shall be followed by the employees.
|
| |
|
In addition to the documents issued by Signal Directorate, there are some other documents issued by Management Representative (MR) / RDSO, in which rules, regulations and instructions applicable to all Directorates have been laid down and shall be followed.
|
*****
|
Source : WELCOME TO RDSO CMS Team Last Reviewed on: 11-11-2011
|
|
|
|