Important Achievement of Signal Directorate during Last Five Years


Bookmark Mail this page Print this page
QUICK LINKS

Important Achievement of Signal Directorate during Last Five Years (Updated Oct.2017)

 

SN

Financial Year

Broad Area of Achievement

Title of Achievement

Description of Achievement

Likely Benefits

Current Status of Implementation

1

2013-14

Safety

Indigenous development of Train Collision Avoidance System (TCAS)

Train Collision Avoidance System (TCAS)

Improvement in safety

Under implementation

2

2012-13

Safety

Specification No. RDSO/SPN/183/2012 Ver 3.0

Train Protection & Warning system

Improvement in safety

Implemented. Zonal Railways are floating tenders.

3

2012-13

Safety

Indigenous development  of multi Section Digital Axle Counter (MSDAC)

 Multi Section Digital Axle Counter (MSDAC)

Improvement in safety

Implemented

4

2012-13

Reliability

Revised Specification RDSO/SPN/165/2012

Integrated Power Supply

Improvement in reliability

Implemented

5

2012-13

Safety

Block Proving by Digital Axle Counter (BPAC) using UFSBI

Block Proving by Digital Axle Counter (BPAC) using UFSBI

Improvement in safety

Implemented

6

2012-13

Reliability

Integrated for main LED Signal (with integrated)

Integrated for main LED Signal (with integrated)

Improvement in reliability

Implemented

7

2013-14

Reliability & Safety

Modelling and validation of interlocking for railway signalling systems

Modelling and validation of interlocking for railway signalling systems

Improvement in Reliability & Safety

Under implementation

8

2013-14

Safety

LED based Flashing Hand Signal Lamp

LED based Flashing Hand Signal Lamp

Improvement in safety

Implemented

9

2013-14

Safety

LED Tail Lamps for Guard

LED Tail Lamps for Guard

Improvement in safety

Implemented

10

2013-14

Efficiency

Capacity Optimization and Simulation Tool(COST)

Line capacity optimization

Improvement in line capacity

Under implementation

11

2014-15

Safety

Fog Pilot Assistance System for Safety

Improvement in specification of Handheld Device which can guide loco pilots about land marks enroute.

Improvement in safety

Implemented

12

2014-15

Efficiency

Fuse auto changeover system

Monitoring of signallint fuses

Improvement in validation

Implemented

13

2015-16

Reliability

iP-67 for Motor Electric Point machine

Improved Point motor

Improvement in reliability

Under implementation (Trial ongoing)

14

2015-16

Reliability

Stainless steel apparatus case drawings

Improved fabricated apparatus case stainless steel

Improvement in reliability

Under Implementation (Trial ongoing)

15

2015-16

Safety

Indigenous development of Advance Auxiliary warning system

Advance Auxiliary warning system

Improvement in reliability

Implemented

16

2016-17

Fire safety

Automatic Fire Detection and Alarm Systems for signalling installations.

Detections and Alarm Systems

Improvement in fire Security of signalling installations.

Specification developed. Vendor approval under process.

17

2017-18

Fire Safety

Automatic Fire Suppression System for signalling systems

Clean agent based fire suppression system.

Improvement in fire Security of signalling installations.

Specification developed

 



Source : WELCOME TO RDSO CMS Team Last Reviewed on: 25-10-2017  

  Site Map | Contact Us | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.