| S.No. |
Title |
Number |
| 1. |
Guidelines For Earthwork In Railway Projects. |
GE : G-1, July 2003. |
| 2. |
Specification For Track Ballast With Correction Slip No.2. |
GE : IRS-1, June 04. |
| 3. |
Specification For Mechanically Produced Blanketing Material For Railway Formation Including Guidelines For Laying. |
GE : IRS-2, July 05 (Final). |
| 4. |
Standard Test Procedure for Blanket Material for Railway Formation. |
IRS:GE-3, July 2003 |
| 5. |
Booklet On Geo-Technical Testing For Railway Engineers For?Quality Control. |
GE : G-3, Dec 2004 |
| 6. |
Guidelines On Erosion Control And Drainage Of Railway Formation. |
GE : G-4, Feb 05. |
| 7. |
Guidelines On Soft Soils-Stage Construction Method. |
GE : G-5, April 05. |
| 8. |
Guidelines For Rehabilitation Of Existing Weak Formations. |
GE : G-6, June 05. |
| 9. |
Guidelines On Temporary & Permanent Restoration Of Embankment After Breaches /Washouts. |
GE : G-7, July 05. |
| 10. |
Manual Of Instructions For C.C. Cube & Rail Cluster Method. |
GE : Misc.-1, July 05 (Provisional) |
| 11. |
Guidelines For Cuttings In Railway Formations. |
GE : G-2, August 05. |
| 12 |
Guidelines For Application Of Jute Geo-textile In Railway Embankments And Hill Slopes. |
RDSO / 2007 / GE : G-0008, |
| 13 |
Guidelines and specification for Design of Formation for Heavy Axle Load |
RDSO / 2007 / GE : G-0014, |
| 14 |
Guideline for Geotechnical Engineering Organisation in Zonal Railways |
RDSO / 2007 / GE : G-0011, |
| 15 |
Guidelines for Civil Engineering Maintenance and Safety in existing Tunnels |
RDSO/2012/GE:G-0015 |
| 16 |
Guidelines for Design & Construction of Tunnels |
RDSO/2012/GE:G-0017 |
| 17 |
Guidelines for safety in Tunnels during Construction |
RDSO/2012/GE:G-0016 |