TECHNICAL REPORTS:
As per Procedure Order No. 1 of 2011 issued by Finance & Accounts Directorate of RDSO, GE Directorate has decided that the Technical Reports given below are classified as technical document and have been declared priced. For internal Railway use, these documents will be issued free of cost. For other users, the photo copy of all these documents will be charged @ Rs 100/- per page. These technical documents may not be reproduced, copied or commercially used without prior written permission of RDSO. For requirement of copies of these documents, contact to the address given in Head-Contact Us” on web portal of GE Directorate on RDSO’s website.
|
S.No.
|
Title
|
Report No.
|
|
1.
|
State-of-the-art report on provision of blanket on railway formations
|
GE-35
|
|
2.
|
State-of-the-art report on quality of blanket material on railway formations
|
GE-37
|
|
3.
|
Procedure order for classification of formation soil including guidelines for testing
|
GE-P1
|
|
4.
|
Report on various methods of formation rehabilitation on railways
|
GE-39
|
|
5.
|
Transition system on approaches of bridges
|
GE-R-50
|
|
6.
|
Manual of instructions for c.c. cube & rail cluster method
|
GE-Misc-1
|
|
7.
|
Formation rehabilitation by blanketing using c.c. crib/cube & rail cluster method
|
GE-R-67
|
|
8.
|
Prefabricated vertical PVC drainage system for construction of embankment on compressible soft soil
|
GE-R-68
|
|
9.
|
Concept and design of reinforced earth structures
|
GE-R-73
|
|
10.
|
Study report on compaction equipments and construction machinery
|
GE-R-76
|
|
11.
|
Study report on use of coal ash in railway embankment
|
GE-0-S005
|
|
12.
|
Study report on collection of data on blanket materials (from year 2002 to year 2004)
|
GE-R-77
|
|
13.
|
Check list for certification of earth work, June 2004 (new lines/ doubling/ gauge conversion projects) (As per Guidelines of earthwork in Railway project, GE: G-1, July’2003)
|
Checklist for certification to ’CRS’
|
|
14.
|
Study Report to assess the availability of subgrade soil on various part of India and its cost implication as per specification enumerated in guidelines for heavy axle load
|
RDSO/2011/GE:SR-0029
|
|
15.
|
Soil Nailing for stabilization of steep slopes near Railway Tracks |
Joint project report with IIT/Kanpur |
| 16. |
Project on Reinforced Earth Wall with its Design Procedure and Cost Comparison for Road Over Bridge with Conventional Slopes/Retaining Walls and Road Over Bridge with Reinforced Earth Walls |
RDSO/2011/
GE: SR-0030
|
| 17. |
Development of Small Width Vibratory Roller for compaction of earthwork in gauge conversion works and narrow width portion |
RDSO/2009/
GE:SR-0031
|
| 18. |
Study report on Ground improvement by stone column |
RDSO/2009/
GE:SR-0032 |