| S.No |
Project Name |
| 1 |
Setting up fire simulation facility at RDSO. |
| 2 |
Consultancy for setting up of fire testing lab at RDSO |
| 3 |
Development of Conical rubber springs for primary suspension as alternative to dashpot guide arrangement for EMUs. |
| 4 |
Upgradation of Vehicle Dynamics simulation software at RDSO. |
| 5 |
Development of crashworthy design of LHB type coaches. |
| 6 |
Development of environment friendly Discharge Toilet System |
| 7 |
Development of Sources for manufacture of Bogie Frames for ICF type bogies. |
| 8 |
Optimizing the design of coupling arrangement and setting up a longitudinal simulation facility at RDSO of Indian Railways |
| 9 |
Development of failure indication device for Air spring suspension bogies. |
| 10 |
Development of EOG double decker design of LHB type |
| 11 |
Development of Conical rubber springs for primary suspension as alternative to dashpot guide arrangement for Mainline ICF coaches. |
| 12 |
Developing fire barrier for doorways and gangway area using coated panels |
| 13 |
Development of cast wheels for EMU’s |
| 14 |
Development of indigenous solid forged wheels for EMU’s |
| 15 |
Low cost FIAT Bogie |
| 16 |
Kolkata Metro Speed Certificate |
| 17 |
Development of crashworthy design of LHB Power Car |
| 18 |
Preparation of specification for 130 KMPH DEMU |
| 19 |
Study of Wheel Shelling of LHB Coaches for improving Wheel Life |
| 20 |
Development of Bio Digester for DRDE Design Bio Toilet |
| 21 |
Procurement of Wheel profile measuring instrument (Mini Prof) |
| 22 |
Development of Vacuum Toilet |
| 23 |
Different Colour Coordinated Coach Interiors on a Single Coach |
| 24 |
Development of High Capacity Milk Tanker |
| 25 |
Optimizing Design of Soft Side Buffer/Coupling Arrangement and Setting up a Longitudinal Simulation facility |
| 26 |
Redesign and Updation of Coach Interiors |
| 27 |
Technical Clearance and Speed Certificate of Airport Metro |
| 28 |
Development of cushioning material |
| 29 |
Fire Detection and Alarm System |
| 30 |
Development of Side Panel with Noise Damping |
| 31 |
Technical Clearance and Speed Certificate of Bangalore Metro |
| 32 |
Development of Heat Shield Paint for Coaches |
| 33 |
Issue of Corrosion Manual for ICF Coaches |
| 34 |
Updation of Bogie Maintenance Manual for BMBC coaches |
| 35 |
Double acting bogie mounted brake cylinder |
| 36 |
Auto resetting multi orifice passenger alarm device |
| 37 |
Panel mounted brake system for main line coaches |